Project Data

Water tanks for medical clinic in Bad Rothenfelde, Germany

Owner: German Pension fund Hannover operating Teutoburger Wald Klinik

Contractor: Wilhelm Becker, GmbH & Co. KG., Minden

MEVA System: Circular formworksystem Radius

Engineering: MEVA Formwork Systems, Hannover

 

Project

Water tanks for medical clinic formed quickly with circular formwork Radius

Saving Labour on Round Structures

The medical clinic Teutoburger Wald in Bad Rothenfelde, Germany, is improving its safety and water supply for fire fighting purposes. Two new underground concrete tanks were commissioned with a diameter of 10 m and a volume of 235 m³ each. Contractor Wilhelm Becker chose MEVA’s circular formwork Radius on account of costefficiency and labour saving benefits. The 3 m high panels can be delivered to site flat on a truck, making logistics simpler and faster. Once set up on site, the formwork is spindled to exact specification using the Radius ratchet.

„The quick and easy assembly, the shoe for the anchoring rail that clicks into the profile with a spring pin, the fixed crane hook and the base spindle for adjusting the panels on uneven ground worked really well,“ 

says project manager Harald Thielking.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.