PROJECT DATA

Waste-to-Energy in Plymouth

Project: Waste to energy plant, Devonport Docks, Plymouth

Developer: MVV Environment

Contractor (and Architects):  Kier and Construction Services South West (CSSW)

MEVA Systems:  wall formwork Mammut, support frame STB 450, climbing formwork KLK 230, shoring System MEP

Formwork Engineering: Leada Acrow service centres Tavistock, Cardiff and Colnbrook

 
 
1
 

PROJECT

The Future: Waste-to-Energy plant at Devonport Docks near Plymouth

MVV Environment is building a new Waste-to-Energy plant at Devonport Docks near Plymouth. The facility will transform 240,000 tonnes of non-recyclable waste into energy which will provide power to homes in the city of Plymouth when it is completed.

This will have a huge impact on the local economy and bring substantial environmental benefits with it: The facility will divert household waste from landfill each year. The site is split, with the turbine hall on the north side and the waste bunker and tipping halls to the south.

Leada Acrow worked closely with Kier and Construction Services South West (CSSW), contributing designs for the large-scale formwork and falsework structures and providing equipment hire from an extensive product range. This included heavy-duty Mammut wall formwork, MEVA KLK 230 climbing formwork, Co-Planar and MEP falsework plus Soliders, Super A-Beams and support frames STB 450 from Leada Acrow service centres in Tavistock, Cardiff and Colnbrook. Leada Acrow’s service continued in the form of site visits, providing advice throughout the construction process.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.