Project: Multi-storey residential development in Jumeirah Village Circle, United Arab Emirates
Developer: Nakheel PJSC, Dubai, UAE
Contractor: Gulf Technical Construction Co. LLC, Dubai, VAE
MEVA Systems: Wall formwork Mammut 350, Slab formwork system MevaDec, All-plastic facing alkus, Special formwork designs for circular columns
Engineering and support: MEVA KHK Formwork Systems, Dubai, United Arab Emirates
Jumeirah Village Circle in Dubai is the scene of several large-scale residential developments catering to the influx of inhabitants and a growing need for housing in the metropolis. Several multi-storey complexes with up to 1,000 units are being erected.
Typical for residential projects is the demand for the best possible efficiency and speed. Since slabs constitute the largest part of concrete works in terms of area, Gulf Technical Construction Co. looked at the formwork methods very closely. The MevaDec slab system proved best in class in terms of cost, speed, efficiency and quality. These advantages come from flexibility with minimised compensation areas, easy adaptation to building layouts, reduced inventory through the early stripping method and quick cycles without crane. Safety and ease of assembly with zero error (the prop positions are defined by the system) allow for easy planning, logistics and work flow, saving time and money.
MEVA KHK provides full-service engineering and complete supply of formwork to the site from its logistics centre in Dubai.
Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction
One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.
The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.
Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.
MEVA Formwork Systems Pte Ltd
400 Orchard Road
#09-05 Orchard Towers
Singapore 238875