PROJECT DATA

Proton Therapy Centre with wall thickness of 28 ft and slab thickness of 10 ft

Project:  Proton Therapy Centre, Houston, Texas
28 ft wall thickness, 10 ft. slab thickness, 102,257 ft² floor area

MEVA Systems: MEVA heavy-duty wall formwork Imperial with 2,025 psf load capacity

Concreting Specifications: 

  • 3,000 mixer loads of concrete delivered in 10 minutes intervals
  • 300 cubic yards (8122 ft3) of concrete poured every hour
  • 2 concrete pumps running at max. performance (140-160 instead of the normal 90-100 cy/h)

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.