PROJECT DATA

Two 20 /25 level residential towers, The International Quarter, Stratford near London

Contractor: Byrne Bros. Ltd.

Developer: Lend Lease LCR

MEVA Systems: Automatic climbing system MAC, Wall formwork Mammut 350, Wall formwork AluStar

Formwork engineering: MEVA Formwork Systems Tamworth, Haiterbach and Singapore

 
 
1
2
3
4
5
 

Project

Byrne Brothers using MEVA‘s Automatic Climbing System MAC on another Landmark Project in London

Speed, Safety and Quality Concrete Pours: Rising High in Stratford

As part of the Olympic Legacy Byrne Bros. are adding to their impressive portfolio of high rise concrete structures with the construction of two residential towers in Stratford. They form part of the International Quarter development on Londons’s eastern perimeter.

The developers claim the International Quarter will be an inspiring business and living environment with 4 million ft² of workspace, 330 new homes, a major 4 star design hotel, shops, restaurants, childcare and community facilities. The residential options include campus style houses and high rise towers with spectacular views of the City skyline.

It is on these two 20 and 25 level residential towers that contractor Byrne Bros. is using the automatic hydraulic climbing system MAC. This MEVA high-rise technology, its safety housing and wide working platforms won the job on account of its safety, efficiency and quality advantages.

One of them is that the hydraulic lift pushes off concrete that has already set, a big advantage in safety and speed. The climbing pockets are on the inside of the core. This enhances the quality of the concrete finish – a requirement increasingly stipulated by many architects. The lift is very easy to operate with only a small team.

Accuracy and speed of operation with suspended shutters

Mammut 350 wall panels are used as suspended shutters. Their all-plastic facing delivers a superb concrete finish throughout the building process. There is little effort in adjusting the shutters in 3 directions and tight tolerances for accuracy. No special tools are needed.

Hand-set AluStar for columns

In addition to the MAC, Byrne Bros. chose to use the AluStar system for the storey-high columns. The AluStar wall panels are moved by hand and allow for unrestricted, fast concrete pours.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.