PROJECT DATA

3.000 m² MEVA Formwork on Coop Logistics Centre in Schäfisheim, Switzerland

Project: Coop logistics centre with production and distribution facilities on 8 upper levels, ground floor and 5 storey basement on 300x100 m layout

Owner: Coop Genossenschaft, Switzerland

Contractor: Marti Bauunternehmung AG, Zurich

MEVA Systems: Wall formwork Mammut 350, foldable working platform KAB 190, climbing platform KLK 230, Triplex-R heavy-duty props

Formwork engineering: MEVA Formwork Systems, Seon, Switzerland

 
 
1
2
3
4
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.