Project: Medical Centre - Miami Valley Hospital - in Dayton, OH, 5 cores

Contractor: Baker Concrete

MEVA Systems: Heavy-duty wall formwork Imperial and leight-weight wall formwork MevaLite, Climbing Scaffold KLK, Shoring System MEP

Formwork Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 

Project

MEVA Formwork Solution for Medical Centre Dayton, OH

Building the five new cores that form the heart of Dayton´s Miami Valley Hospital presented a true scheduling challenge: They had to be erected simultaneously to keep ahead of the structural steel. 

Since the rebar content was very dense, the supervisors had to take great care to tie in with the structural iron.

The configuration of the cores required extra decking to be provided by MEVA and custom parts were required to solve the issues with erecting the formwork. 

MEVA engineers provided a safe working platform using the climbing platform KLK and MEVA flipper locks.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.