PROJECT DATA

Brake test and development centre for Knorr-Bremse in Munich

Project: Knorr-Bremse, Brake Test and Development Centre, Munich

Contractor: Baresel GmbH, NL München

MEVA Systems: Wall formwork Mammut 350, Column formwork CaroFalt, Shoring tower MEP, MD and ME props, Foldable working platform KAB, Slab formwork MevaFlex

Formwork Engineering: MEVA Formwork Systems, Munich branch, Germany

 
 
1
2
3
4
5
6
7
 

Project

Industrial Construction at Top Safety Level

Brake test and development centre for Knorr-Bremse

100 different test systems for utility vehicles and freight trains up to 1,585 m long, simulating and testing their braking behaviour according to European and Russsian standards in climatic conditions ranging from -60° C to +80° C. Plus a building area covering 16,900 m², of which alone the experimental workshops take up over 1,000 m².

These are only some of the highlights surrounding the test and development centre being built for Munich-based braking technology corporation Knorr Bremse at its company headquarters. Top international standards regarding safety, process organisation, efficiency, logistics and quality, energy saving and sustainable development are being put into practice.

The challenges facing the concrete team are unusual. Foundations and walls, 40 % of them with a fair-faced concrete finish, columns and slabs were poured using MEVA rental formwork supplied to the contractor Baresel GmbH.

Architecural finish with even tie hole and joint pattern required
The walls, up to 40 cm thick, are up to 15 m high in the basement, 9 m high on the ground floor and 3.80 m high on the upper floors. They were poured using the Mammut 350 wall system. The large wall sections are poured in cycles of 12 m in length. The 3 m panels are ganged to achieve the respective wall heights. Combining same size panels achieves a harmonious tie-hole and joint pattern.

The Mammut 350 system‘s high load capacity of 100 kN/m² saves much time, since there are no limitations on the pour rate up to a height of 4 m. The inside walls, partly interrupted by consoles, intermediary slabs und wall sockets were formed without any site- built shuttering thanks to the system‘s large choice of panel sizes. This, too, contributed to the top concrete finish.

Maximum worker safety thanks to continuous fall protection
Work protection is exemplary. Fall protection is installed without a gap. Even so, safety installations are placed so that work and material flow are not hampered. In addition to the KAB working platforms and MEP shoring towers, safety systems such as the CaroFalt column formwork are in use.

Brake test and development centre A fixed ladder access with safety cage and a working platform with all-round protection are part of the system. No further safety equipment is required.

Site managers Johann Rottenkolber, Andreas Stumpf and Nils Köster come to the following conclusion after their good experience with MEVA formwork and engineering on this challenging construction site:
“The large selection of panel sizes in the Mammut 350 system, the superior concrete finish achieved with every pour and the repair set with which we were able to fix damages to the alkus all-plastic facing on site appealed to the entire construction team.”

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.