PROJECT DATA

Jazz Residences in Manila, Philippines:
Residential High-rise Building

Project: Residential High-rise housing block with partition walls inside.

Contractor: Megawide

MEVA Systems: Light-Weight Hand-Set Formwork AluFix, automatic climbing formwork system MAC

Formwork Engineering: MEVA Formwork Systems, Singapore

 
 
1
2
3
4
5
6
7
 

Project

Mass house building

A new method using MEVA’s wall formwork AluFix saves time and money

Modern homes are in increasing demand by the growing middle class in South East Asia and the Middle East. Building residential high-rises and housing blocks fast and efficiently without compromising quality or safety is a major challenge to local contractors in many Asian countries. The solution to the challenge is fast tracking the partition walls inside the buildings. MEVA’s crane-independent wall formwork system AluFix is extensively used for fast tracking because the panels can be carried manually and are ideally geared to the heights of partition walls. 

Fast-tracking partition walls eases the building process
How does fast-tracking work? First, the structural walls of a floor are erected, but no partition walls. Then, large panel areas of slab formwork are set up. This is done much faster than usually because there are no hindering inside walls. After pouring the slab and stripping the slab formwork, the partition walls on that floor are poured.

Sizes to fit any wall size
With four panels heights from 132 to 300 cm and over 10 widths from 20 to 75 cm per height, AluFix easily handles typical room heights and partition walls of any size and form. If the walls differ in height and width from standard sizes or from each other, the panels can be combined vertically and horizontally to reduce the panel selection to be held on stock on site. Standard fillers are available to bridge gaps. As the formwork for the partition walls extends to or almost to the poured slab, the concrete is poured through holes in the slab. If this is not possible, e.g. under RC beams, panels with filling nozzles are used for concrete pouring. 

The most efficient method with the best concrete surface
Subsequent partition walls can also be erected using hollow bricks, Spraycrete or Macro panels (prefabricated concrete hollow panels). Yet by using AluFix, contractors save efforts, time and costs for different reasons: no material (hollow bricks or Macro panels) needs to be transported, the concrete finish achieved with AluFix is much better than with hollow bricks and plastering work is minimised.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.