MEVA Guided Screens MGS

MGS: Guided Screen Safety System with all-round Worker Protection

The rail-guided MGS Guided Screens System offers optimum all-around worker protection for safe work on slabs or at slab edges in great heights − fall-down, wind and visual protection. The MGS units are safely installed on the ground and remain anchored to the building throughout the building process. Climbing is done by crane or with the MGS hydraulic equipment.

 
Features & Benefits
Animation
References
Download
Complementary systems

Features & Benefits

Configuration

Modular system for climbing and screens

  • Simple logistics and disposition

Always anchored to building, also when climbing

  • Maximum safety requirements fulfilled

Completely surrounded by screens

  • Optimum work safety and labour performance

Construction

Level heights from 3,00 m to 4,25 m

  • Flexible planning for all high-rise buildings

Climbing Process

Lift also with hydraulic ram instead of a crane

  • Saves crane time

Free positioning of guiding profiles up to a width of 4,50

  • Flexible adaptation to layout and geometry of building

Simple to lift using guiding profiles

  • Reduces crane time

Safe work independent of any wind load

  • Minimised interruptions due to weather
MEVA Guided Screens MGS Features & Benefits
 

References MGS

  • WINX Tower: One floor higher per week

    The MEVA MGS and MGC systems being hydraulically climbed up the WINX Tower in Frankfurt am Main, Germany. This saves crane and waiting time.

  • MAC and MGS on World Hotel & Residences

    MEVA climbing technolgy MAC and MGS are safety and efficiency solutions - as shown on the Hotel One site in Manila, Philippines

  • 178-m Skyscraper - Roche Tower in Basel

    The tower is being climbed using MEVA‘s automatic hydraulic System MAC. With its completely closed platform it provides a safe working environment even at great heights.

  • Zurich: Working safely up in the air

    The MEVA Guided Screens protection system MGS encloses complete floors protecting workers and equipment against wind and weather. Together with other MEVA systems, MGS is in use on an office tower that is being built in a mixed residential and office area outside Zurich.

Download

Complementary systems

Request a Quotation

 
 

Invest in MEVA Used Formwork

MEVA Original Used Formwork

Rental Formwork

MEVA Rental Formwork
 
All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.